Under the tab Operation schedule, operations are planned and executed in the current outage. Dynamic coloring, customer consequences and outage statistics are based on these operations.
The operations usually consist of the valve operations Close and Open. Objects and any planned time for execution are defined in a row in the operation schedule for the outage. When the operations have been executed, this is marked in the row.
You can execute an operation immediately, retroactively or in the future. If you set the planned time to past time, the row is marked as executed directly. If you set the planned time further ahead, you can use the function Execute automatically. Then the operation is executed automatically at the specified planned time.
The operation schedule has the following fields (default configuration):
Row ID |
Row serial number. |
Object type |
The type of object on which the operation is to be executed. |
ID |
Object ID. |
Adress |
Street address of the object. |
Site |
The name of the site where the object is located. |
Description |
Information about the operation. |
Operation |
The operation to be executed on the object. Note that an administrator can modify and add new text by adjusting the corresponding code list. |
Customers affected |
Number of customers affected by the connection. Positive numbers indicates the number of customers without delivery, negative numbers that customers have regained delivery. If the row is executed, the number means the actual number of customers affected. |
Planned time |
Planned time for executing the operation. If you have selected Executed automatically, the operation is executed automatically at the specified planned time. |
Execute automatically |
The icon The icon |
Executed time |
The time when the operation was executed. |
Executed by |
The user name of the person who executed the operation. |
Executed |
The icon The icon |
Right-clicking on a row in the outage provides the following functions:
[Object type] > |
Opens the right-click menu for the object type in the selected row with additional options, for example, showing the object in the active view. |
Execute |
Executes the operation in the current row. |
Execute until here |
Executes the operations in the current row and all the rows above. |
Undo |
Undoes the operation in an executed row. There are certain limitations on the undo function, such as that it must apply to the last executed row in the operation schedule and that no later operation is performed on the same object in another operation schedule. This is to prevent inconsistent customer consequences. |
Edit attributes |
Opens the Operation dialog box where you can change the attributes of the operation. Note: The time can only be changed after the operation has been executed. |
Include/Exclude usage |
Opens the Operation dialog box where you can change the attributes of the operation. Note: The time can only be changed after the operation has been executed. |
Delete |
Deletes the row in question |
Open the Operation dialog box with the menu option Include/Exclude usagein the right-click menu.
Row ID |
Row serial number |
Operation |
The operation to be executed on the object. Note that an administrator can modify and add new text by adjusting the corresponding code list. |
ID |
The system ID of the object. |
Description |
Information about the operation. |
Site |
The name of the site where the object is located. |
Device address |
The street address of the object. |
Planned time |
Planned time for executing the operation. If you select Execute automatically, the operation is performed automatically at the specified planned time. |
Executed time |
Time when the operation was performed. |
Execute automatically |
If selected, the operation will be performed automatically at the specified planned time. |
The following buttons are available:
Adds a new operation (row) to the operation schedule. Press the arrow next to it to select Add free operation. |
|
Mirrors all rows in the operation schedule. |
|
Move selected operation up or down in the list. |
|
Calculates the number of customers who will be affected if the operation schedule is executed. The result is shown in the column Customers affected in the operation schedule. The operation is not executed. |
To add an operation you create a new row in the operation schedule.
1.Press the icon Add connected operation and select a tripping device in the map. The Operation dialog opens.
2.Set your desired options and press OK. A new row will be added to the operation schedule.
This function allows for adding operations without any connection to a network object. The function can for example be used as a reminder to, after closing a valve, call a certain colleague or announce the affected customers.
1.Press the arrow next to the plus icon and select Add free operation. The Operation dialog opens.
2.Set your desired options and press OK. A new row will be added to the operation schedule.