<< Click to Display Table of Contents >> dpPower > Menu reference > Place > Cable pillar template > Scheme... |
The function places previously defined cable pillar templates in the scheme.
1.Select Place > Cable pillar template > Scheme.... When the function has been started, a dialog opens.
2.Select the desired cable pillar template from the list.
3.Then select the desired state.
4.Press OK to accept deployment with or Cancel to cancel deployment.
5.Place the cable pillar template in the graphical view with the left mouse button.
6.Turn the cable pillar template to the desired position and left-click to attach it in the view.
7.In the attribute menu that opens, a new ID can now be entered.
8.Press OK.