In fieldwork, there are a number of situations where a risk analysis must be performed and documented before work can begin at a workplace. This analysis is usually dependent on the nature of the work. Therefore, there is a need for different types of analysis, both standardized and spontaneous.
In Organizer there is the possibility to create and document risk analysis. These are linked to activities or decision points. You can register more than one risk analysis for an individual activity, if, for example, you need to repeat and document the analysis every time the workplace is visited during the performance of the activity.
You first decide which activity types or decision point types should be able to have this possibility. This is done by configuring a label. See section Labels.
In order to create standardized risk analysis, it is possible to build risk analysis templates that can then be applied in the current situation.