Meter Poll

<< Click to Display Table of Contents >>

Operator > Meter Switch and Poll >

Meter Poll

Reading data from meters regarding electricity parameters, production or consumption of electricity.

1.Do the steps under Access to Meter integration functions.

2.Select Momentary reading.

The result displayed in the dialog contains the following data for the selected Delivery point:

Name of the meter and subscription.

Date and time of the measurement.

Active energy, consumption [kWh].

Active energy, production  [kWh].

Active power L1 [kW].

Active power L2 [kW].

Active power L3 [kW].

Apparent power [kW].

Current L1 [A].

Current L2 [A].

Current L3 [A].

Reactive energy, consumption [kVArh].

Reactive energy, production [kVArh].

Reactive power [kVAr].

Reactive power L1 [kVAr].

Reactive power L2 [kVAr].

Reactive power L3 [kVAr].

Voltage L1 [V].

Voltage L2 [V].

Voltage L3 [V].