In the tab Linked subprojects, tasks that are linked to the selected outage are shown.
Note! That the module Organizer is required and needs to be installed in order for this function to work. The role DSG_USER is also required and needs to be added.
The outage will be shown in the east panel in the tab Linked objects when Organizer is opened and the task is selected. In the example below it is the task with the task ID 23225 where the outage with the outage number 6206 will be shown in the tab.