<< Click to Display Table of Contents >> Operator > Events |
In the tab Events, all switching operations regarding the actual state are listed, regardless of their origin (SCADA, Operator or a manual switching operation by using the administration functions).
(1) The checkbox Only unbound operations
Check the checkbox Only unbound events to see switching operations that does not belong to an outage. Uncheck the checkbox to display all switching operations.
(2) Search fields
It is possible to filter the search on Outage ID, SCADA ID, ID, Placement, time period (From(date), To(date)), Join with trace, Hide invalid (if unchecked it will also list invalid operations) and Max number of rows.
(3) Search
Press the button Search to update the switch operations list.
Executed operations can, by using right-click, be moved from an outage in the tab Switch order to the tab Events and vice versa. This means that it is possible to move an operation from the Events list to the tab Switch order as well. If the right-click alternative is grayed out, it is most likely that the origin of the outage is not from SCADA.
By the use of this methodology it is hence possible to move an operation from one outage to another.
The effect on customers are stored for each operation which implies that the Events list may include operations that affects customers. To achieve a correct outage statistics these operations have to be moved to the current outage.
Move event to outages (switch order)
The following rules apply when moving an operation from the events list to the switch order of an outage.
▪The operation needs to be free, i.e. not already belonging to an outage
▪The operation Executed date/time determines where it will be located in the switch order.
The following rules applies when moving a row in the switch order of an outage to the events list.
▪The operation must have been Executed.
▪The operation must be the last executed operation in the switch order list.