<< Click to Display Table of Contents >> Maintainer > Inspection plan > Add an inspection plan |
1.Select the objects you want to create an inspection plan for:
oAlternative 1
a.Press the Query tool (F11) to list all objects that lack an inspection plan.
b.Select the tab Reports > Inspection > Inspection preparation.
c.Fill in the desired search criteria and press Search.
oAlternative 2
a.Select one or more objects on the map.
2.Right-click on the desired objects and select:
oAlternative 1
a.Maintainer > Add inspection plan > ...with fixed interval. The Add inspection plan dialog opens.
b.Select a planned start date and press OK.
oAlternative 2
a.Maintainer > Add Inspection Plan > ...with Plan Template. See section Add inspection plan with plan template.
To add an inspection plan with plan templates, Maintainer Advanced is required. |
1.In the attribute form for the desired object, select the Inspection tab.
2.Press the Add inspection plan icon and select:
oAlternative 1
a.Add Inspection plan with fixed interval.
b.Select a planned start date and press OK.
oAlternative 2
a.Add inspection plan with plan template. See section Add inspection plan with plan template.
To add an inspection plan with plan templates, Maintainer Advanced is required. |