Add an inspection plan

<< Click to Display Table of Contents >>

Maintainer > Inspection plan >

Add an inspection plan

Add inspection plan via right-click menu

1.Select the objects you want to create an inspection plan for:

oAlternative 1

a.Press the Query tool (F11) to list all objects that lack an inspection plan.

b.Select the tab Reports > Inspection > Inspection preparation.

c.Fill in the desired search criteria and press Search.

oAlternative 2

a.Select one or more objects on the map.

2.Right-click on the desired objects and select:

oAlternative 1

a.Maintainer > Add inspection plan > ...with fixed interval. The Add inspection plan dialog opens.

b.Select a planned start date and press OK.

oAlternative 2

a.Maintainer > Add Inspection Plan > ...with Plan Template. See section Add inspection plan with plan template.

To add an inspection plan with plan templates, Maintainer Advanced is required.

 

Add inspection plan via attribute form

1.In the attribute form for the desired object, select the Inspection tab.

2.Press the Add inspection plan icon and select:

oAlternative 1

a.Add Inspection plan with fixed interval.

b.Select a planned start date and press OK.

oAlternative 2

a.Add inspection plan with plan template. See section Add inspection plan with plan template.

To add an inspection plan with plan templates, Maintainer Advanced is required.