<< Click to Display Table of Contents >> dpPower > Menu reference > Tools > Trace > Standard (fast) > Substation (primary) incl. underlying |
Tracks a distribution point. Brings all voltage levels down. Stops tracking even on switches that are open.
The result is not saved. |
1.Select Tools > Trace > Standard (fast) > Substation (primary) incl. underlying to start the function.
2.Select a Distribution point in the graphical view. Traced objects are displayed with the color of Highlighted (Settings > Change settings... > Basic tab > Basic colors field > Highlighted).
The trace take transformer directions into account. If it is an up transformation, customers who are at the upper voltage level are shown. |
Network before trace:
Traced network: