Show linked objects (new-replaced cable pillar)

<< Click to Display Table of Contents >>

dpPower > Menu reference > Tools > Relations > Net regulation >

Show linked objects (new-replaced cable pillar)

This function allows you to display the link between a new cable pillar and a destroyed cable pillar to be replaced by the new cable pillar.

 

1.Select Tools > Relations > Net regulation > Show linked objects (new-replaced cable pillar).

2.Select the objects for which you want to show links. The Object links window opens and lists the existing links for the selected object.