<< Click to Display Table of Contents >> dpPower > Menu reference > Tools > Connect in stages |
With the connect in stages function, it is possible to trace a network and change the stage to In use.
Prepare the staged connection by opening the normal connection mode for the tripping device that will limit connection.
1.Select Tools > Connect in stages.
2.Left-click in the network. The function traces networks in stage Planned or Designed and stops at all tripping devices that are normally open. The traced network will be highlighted and a dialog to confirm the operation will open.
3.Press OK to confirm. Status of the traced objects is changed to In use.