In the Economy tab of the East panel, a summary of financial data for a task is displayed. Here, all time reports and material usage associated with the task are shown.
1.Select Organizer > Show Organizer. The south panel opens.
2.Select a task in the task tab. The east panel opens.
3.In the east panel, select the Economy tab.
In the Time Report tab, all time reports added for all activities in a task are displayed. At the bottom of the tab, there is a summary of the total hours.
The wage types you can select in a time report depend on the type of task:
•For an Internal task, wage types are displayed in the Internal Time category.
•For other tasks, wage types are displayed in the Productive Time category.
1.Open the activity for which you want to report time.
2.Add or open a Time Report.
3.Enter the date, number of hours, and other details.
4.Select Wage Type. The list contains only the wage types applicable to the task type.
5.Save the time report.
If a wage type is missing from the list, you need to check that it has been categorized as Productive Time or Internal Time.
In the Material Usage tab, all material usage added for all activities in a task is displayed.