Cable installation sanity report

<< Click to Display Table of Contents >>

dpCom > Appendix > Reports >

Cable installation sanity report

 

The report Cable installation sanity report is found under Query tool > Reports > Opto. The report checks whether the length (blowing distance) and diameter (minimum bore) of selected cables match the length and inner diameter of the pipes in which they are placed.

The report lists System ID, State, Cable type, Blowing distance, Blowing distance status, Minimum bore and Minimum bore status.

Limit your search by using the search fields ID and Year of construction. You can also narrow your search by using the drop-down lists to filter by Cable type and Stage and by selecting the check boxes In saved object list, Only changeset and Within area.

Click the arrow at the far right of the table to change displayed columns and other column settings.